Built for Fantasea Cruises and now run by Cruise Whitsundays, this is the first fully composite pontoon in Australia. It was designed by Wagners CFT’s in house design and engineering team and built by Wagners CFT’s production and installation team. The Pontoon comes fully equipped with its own composite gangway which is a massive 22 metre long truss structure which moves up and down with the tides, this was also Wagners CFT’s first long span truss structure.

Wagners CFT marine infrastructure products provide high-quality , durable solutions for projects globally from small boat pontoon floats to large jetty repairs or replacements.  Wagners CFT provide flexible design options with ease of installation ensuring the best possible project outcomes in the face of harsh marine environments with minimal ongoing maintenance required.

Wagners CFT Fibre Reinforced Polymer (FRP) structures will be designed to Australian codes and conditions in accordance with maritime structure specifications, mooring and vessel loads and to perform in floods and cyclones.  Wagners FRP structures are quick and easy to install, lightweight, termite proof, resistant to acid sulfate soils, and are chemically inert so will not rot, rust or corrode.

Port of Airlie Pontoon Marine Infrastructure

View in Google Map